The Direct Engineering Pilot for A/C Hose Design-Manufacture (Workshop Interpretation Meeting) Ford Motor Company Climate Control Division

Summary: Pending
Contents of report: Workshop Products Summary (Tangble& Intangible); Interpretation of Products; Structural Thinking; Conclusions & Recommendations. Appendix A which holds copies of six supporting slides titled: --Comparing Participant Choices of Five Most Important Problems (printed from Variant Design Workshop May 29 1993. --Problematique for RRM Variant Design Process --Cultural Top Ten --Problematique for Cultural Issues Associated with Analytical Powertrain with Category Titles (printed from Analytical Powertrain Workshop 4 August 25-27, 1992) --Analysis - Structural Scoring Analysis of Cultural Categories --Problematique for Developing and Implementing Analytical Powetrain, with Categories (printed from Analytical Powertrain Workshop April 14-16 & 23-24, 1992). The report is listed in Warfield Collection Finding Aid under this heading: "THE DIRECT ENGINEERING PILOT FOR A/C HOSE DESIGN - MANUFACTURE," FORD MOT OR COMPANY CLIMATE CONTROL DIVISION JULY 26, 1994 (BOX 13 , FOLDER 15 )

Additional Info

  • Size: 20 p
  • Description: One DVD
Read 105 times Last modified on Sunday, 07 May 2017 12:43

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.